16 Jul 2025
This month, we poured the roof slab on Tower One, a major milestone in Cascade’s construction journey. With 75% of residences now sold, momentum continues to build both onsite and off. Step behind the scenes and see how Cascade is coming to life.
Bathrooms on lower levels are nearing completion.
A first-look inside a ground floor 3 Bedroom apartment kitchen with Caesarstone
benchtops, Miele appliances and timber joinery.
Plasterboard being cut and installed in Tower Two.
Balustrades being measured and installed.
Waterproofing being carried out in upper level bathrooms.
Our travertine-look, large format floor tiles being installed in a 2 Bedroom apartment.
Slab being poured for the villas and wellness amenities.